Sithe Everett & Sithe Weymouth Power Plants

Job Highlights:

  • Installed Underground Pipe
  • Expedited Pipe Installation Schedule
  • Fused PVDF, PPL & HDPE

 


Underslab chemical waste drainage

J.F. White, as Boston Power Group, was contracted to install underground process piping and plumbing for the Sithe Power Plants. The work for this project included installing carbon steel, stainless steel, HDPE, CPVC, PVDF, PPL and cast iron soil weight piping systems. Pipe sizes ranged from three-quarter inch to sixteen inch. This work was performed in accordance with the new ASME B31.1 power plant codes.

One important part of this job was meeting an aggressive project completion date. In order to speed the project toward completion, J.F. White prefabricated portions of the pipe systems in order to minimize the amount of time that the excavated areas were open. This time-saving technique allowed J.F. White to focus on the next phase of the project and to eliminate heavy job site traffic.

This project demonstrates how close coordination between J.F. White’s Civil and Mechanical groups created a synergistic team that could meet the requirements of a demanding project schedule.