This
structural foundation of walls and a specialty
slab was constructed for a new 250,000 square
foot optic manufacturing plant.
Construction
began with open cut excavation. The crew then formed
and placed footings, walls, piers, and slabs including
the setting of anchor bolts.
Within
the footprint there was a 50,000 square foot clean
area consisting of a 4’ deep structural base slab,
as well as structural/architectural shear walls,
columns, and an elevated waffle slab. The project
started with 60% design structural drawings.
J.
F. White employed the partnering concept with the
owner and designer to successfully complete the project
on time and below budget.