Gas Main Relocation Work

Job Highlights:

  • Welding
  • Pipefitting
  • Earth/Clay Excavation
  • Equipment

     

     


Gas line at the corner of Bremen Street and Prescott Street, East Boston, MA

In support of both the MBTA South Boston Piers Station & Tunnel project and the MBTA Blue Line Track, Signal and Power project, our Mechanical Division managed and performed the relocation of several gas utilities within the rights of way. Gas mains of up to 24" diameter requiring 100% radiograph inspection were completed with the highest standards of quality.

All certified welding is performed under stringent performance criteria, where quality control and quality assurance are maximized.

This competence within the J. F. White Co. provides a very efficient complement to our civil capabilities, allowing for improved schedule and reduced costs overall.

Having managed and coordinated significant utility work for the MWRA on Deer Island, our mechanical personnel are pre-qualified for the most complex and difficult projects in the field.