Logan Airport Facilities 2 Expansion Phase I

Job Highlights:

  • Furnished and installed prefabricated metal building.
  • 2,600 lf wood pilings
  • Furnished and installed Glycol tanks and piping systems.
  • Demolition of existing Purchase Building.


The contract at Logan Airport for Massachusetts Port Authority consisted of the construction of a large new preengineered steel frame on a driven pile foundation Vehicle Storage Building with metal siding and metal roof. Also included was the construction of a new wood frame Sand Storage Building on cast in place spread footings. A new steel frame addition was constructed to the existing Facilities 3 building, renovations to the existing stockroom building and the electrical stockroom including upgrades to the existing fire protection system and electrical system.

J.F. White furnished and installed a 25,000 and 45,000 gallon capacity above ground double wall horizontal Glycol storage tanks on a concrete foundation and associated underground utilities.

This project consisted of work airside and landside.

Contract Amount: $8,059,000.