Joint Venture - J. F. White/Slattery-Skanska/Perini
One
of the most technically challenging of the Artery projects,
"C15A1" stands as a prime example of the positive cooperation
possible between owner, designer, abutters, highway users,
and the contractor.
In
the very heart of Boston's North End, minimizing urban impacts
is an essential element of success on the project.
This
section of tunnel consists of eight mainline lanes and multiple
ramps for access and egress in each direction. The tie-ins
to the existing Sumner and Callahan Tunnels will be completed
at a depth of 110 feet below and adjacent to Hanover Street.
Multiple phases allow for optimal traffic flow during construction.
With
a management, supervisory and engineering team of over 50
individuals dedicated to this effort, and multiple trades
and crews continuously working extended days and weeks,
J. F. White as joint venture sponsor has shown the competence
and capability as a company to undertake the most challenging
of major projects.