A Bailey Control based distribution system is used to operate the power plant. This system collects and integrates data from the treatment plant, fuel supply, boiler combustion and environmental readings to maximize the Deer Island Treatment Plant usage of the power plant while operating within safe and legal limits.
The power plant also houses two turbo power and marine combustion turbine/generator sets rated at 26MW each, running on No. 2 fuel oil supplied from two 750,000 gallon storage tanks located north of the plant.
J. F. White requires all welding to be performed in accordance with its procedures. We employ certified welders that have over 40 years of construction experience, which enables them to produce the highest quality welds. In addition, J. F. White employs a certified welding inspector who also serves as our Corporate QA/QC Manager. This project is an excellent display of many of our work capabilities, such as the coordination of barging material due to limited road access on the island, installation of process pipe, electrical installation, concrete work, and setup of equipment.