Shady Hill School

Project Highlights:
  • 170 Helical Piling
  • 1,670 LF Duct Bank
  • 13,000 SF Steel Sheeting
  • 20,000 CY Excavation
  • 180 PIF's
  • Installed 160 StormTech chambers for  stormwater runoff
  • Excavation Dewatering at a rate of 300+ GPM
  • Excavation Footprint: 180’ x 100’ x 15’ Deep

 

J.F. White Contracting was contracted by William A. Berry & Son, Inc. to be the site contractor which included support of excavation and foundation support for the construction of the Art Building and Athletic complex at Shady Hill School.

Also included in this project was the demolition of the existing buildings, excavation and dewatering for the two new buildings, installation of sewer, drainage, water, electric and telephone utilities. J.F. White installed helical piles, steel sheeting and tie-backs for underground parking garage at the Athletic Complex.

After buildings were complete, J.F. White installed site lighting, curb, bituminious paving, and graded the athletic fields and sidewalks.

Contract value: $4,556,218.